+254 143 293 534

Industry Focus • Construction

Construction — NCA-Compliant Power & Zero-Theft Sites

For 5–30 floor builds where KPLC trips and night theft kill margin. We pass NCA first time and cut theft -90%.

Top pains we solve for Construction:

  • Site power trips — 63A DB on 100A load, no load study
  • Theft on site — Ksh 2M/month, no evidence, insurance rejects
  • OSHA observations — 12 → stop-work, no KEBS docs
  • PPE non-wear — helmets off in heat, boots blister
Construction

Services Tailored for Construction

Electrical

site power, tower lighting, 80–200kVA gensets + ATS

CCTV

32× 4K + NVR 30-day + access + mobile — theft -90%

PPE

helmets (EN 397), boots (S3 SRC), hi-vis (Class 3), harnesses (EN 361)

Maintenance

pumps, mixers, vibrators — 250h mobile service

NCAOSHA Construction 2007KEBS PPE EN 397/20345EBK temporary works

Featured Case Study for Construction

CCTV Surveillance Project

CCTV Surveillance Project

Comprehensive CCTV system design and installation for industrial site security, monitoring, and access control.

Read case study →

PPE Bundle for Construction

Pre-kitted for construction — KEBS certs, training, 7-day swap. From KES 8,200/kit (50+).

Build Construction Bundle

FAQ

Construction — FAQ

Do you supply NCA-compliant site power?

Yes — EBK-stamped drawings, 7-day load log, test certs, and NCA docs. First-time pass >95%. Includes 4h response.

Can you install CCTV on active sites?

Yes — night and weekend installs, PoE, no trenching across slab. Mobile viewing from day one, 30-day storage.

Need Construction Experts?

Get Fixed-Price Quote in 24h