+254 143 293 534

Our 6 Services • Ruiru HQ • Spur Mall • 200+ Installs Since 2015

Six Services, One Audit File — Mechanical, Electrical, Maintenance, CCTV, Safety & PPE

One NCA-licensed partner from Thika to Kwale: we audit in 1 day (free in Nairobi metro for contracts >3 mo), propose fixed-price in 24h with spares, timeline and KEBS docs, and hand over with 2-year warranty. No 4-contractor chase.

200+ installs • 47 lines at 98.2%Thika -72% downtime • Athi penalties 024h audit → 24h proposal • 4.2h replyRuiru 24h • National 72h
Mechanical EngineeringThika: -72% downtimeFrom KES 85k/mo per line

Mechanical Engineering

End-to-end mechanical engineering services for process plants, fabrication shops and industrial equipment installations.

  • Laser alignment ±0.05mm + load test
  • Carbon/stainless/HDPE + 6G welding + NDT
  • Spares kitting — 24h Ruiru dispatch
14% → 3% in 4 wksNCA 3 • EBK • KEBS NDT
View service →Thika case study
Electrical EngineeringAthi: penalties 0Audit from KES 45k

Electrical Engineering

Certified electrical engineering for power distribution, motor control and energy efficiency in industrial facilities.

  • 11kV/415V, MCC/PCC, PFC 20–35% saving
  • 200kVA genset + AMF/ATS 8s sync
  • Thermography + 7-day load log
Penalties KES 120k → 0EBK • EPRA • IEEE 446
View service →Athi River case
Industrial MaintenanceKwale: 98.1% availabilityFrom KES 85k/mo per line

Industrial Maintenance

Reliability-focused maintenance programs designed to minimize downtime and extend the life of critical assets.

  • Vibration + thermography + oil analysis
  • 250h in-pit service, 38 checks
  • CMMS + spares + monthly report
98.1% on 340t fleetOSHA 2007 • KEBS • NCA
View service →Kwale mining
CCTV & Security SystemsNairobi: theft -90%8-cam kit KES 280k

CCTV & Security Systems

Advanced surveillance and access control solutions for industrial sites, commercial facilities and security-critical areas.

  • 32× 4K + thermal/ANPR + PoE
  • NVR 30-day + NAS + mobile
  • Motion alerts + access link
-90% theft in 60dCA • KEBS • Data Act
View service →Nairobi IA
PPE SupplyKwale: 0 observationsKit KES 9,500 • Bulk 8,200

PPE Supply

High-quality personal protective equipment for workers in construction, manufacturing, and industrial environments.

  • EN 397 helmet, EN 388 gloves, S3 boots
  • 3 sizes, fit-test on site, 7-day swap
  • Toolbox Swahili + KEBS docs
12 → 0 obs in 6 moKEBS D-mark • OSHA
View service →Kwale PPE
Project ManagementOne PMO, one dateFee 8–12% or KES 150k

Project Management

End-to-end project management for industrial installations, upgrades and turnkey facility projects.

  • Baseline + S-curve + EVM (SPI/CPI)
  • Vendor prequal + kitting + expediting
  • QA/QC + NDT + O&M + training
On time + audit fileNCA • EBK • PPRA
View service →All projects

Mechanical KES 85k/mo • Electrical audit KES 45k • PM KES 85k/mo • CCTV KES 280k • PPE KES 9,500/kit • PM fee 8–12% — all fixed-price in 24h after audit. Spares kit included.

Why Kenyan Factories Choose Dynatec for Turnkey Services

One Partner, Zero Handoffs

Mechanical, electrical, maintenance, and PPE from one NCA-licensed team. No chasing 4 contractors when the line stops at 2am.

Audit-Ready Every Time

EBK-stamped drawings, KEBS certs, NDT, thermography, and O&M manuals — pass NCA/OSHA first time, as 95% of our clients do. Thika, Athi, Kwale all passed.

Fixed Price, 24h — Not Dayworks

1-day audit (free in Nairobi metro for contracts >3 mo) → fixed-price proposal in 24h with spares, timeline, and 2-year warranty. Avg reply 4.2h.

As a leading industrial engineering company in Kenya, Dynatec delivers mechanical engineering (installation, piping, fabrication — Thika -72%), electrical engineering (power distribution, generators, PLC/SCADA, VFDs — Athi penalties 0), industrial maintenance (preventive, predictive, corrective — Kwale 98.1%), project management (planning to commissioning — one PMO), CCTV and access control (Nairobi theft -90%), and PPE supply (32 products, 8 categories, KEBS-certified — Kwale 0 obs). We serve manufacturing, construction, mining, energy, and logistics across Nairobi, Thika, Athi River, and nationally — with 24–72h mobilization and spares kitted in Ruiru. See case studies like Manufacturing Plant Upgrade (-72% downtime) or PPE bundles from KES 8,200/kit. Every service is detailed at mechanical, electrical, and safety pillars with pricing, compliance, and FAQs.

Service Deep Dives — Choose With Evidence, Not Brochures

Every Service, From Audit to Handover — What You Actually Get

Mechanical Engineering — Laser-Aligned, NDT-Traced, 2-Year Warrantied

A 0.5mm misalignment wastes 6% energy and halves bearing life. We laser to ±0.05mm, log it, and hand you a 12-page report — not a receipt. In Thika, 14% downtime fell to 3% in 4 weeks, +18% throughput — same people, same shifts. 200+ installs, 10+ years, SKF/FAG on shelf in Ruiru — your 6314 bearing is 3 hours away, not 3 weeks via DHL. Carbon, stainless, HDPE — 6G weld, NDT, 1.5× hydro test, supports to BS 3974. Spares kitted for 6 months, CMMS 124 tasks pre-loaded, 72h trial at 110% with vibration 0.8 mm/s. That’s not “mechanical work” — that’s an auditable install that NCA praised with zero observations.

Plant equipment installation, piping & fabrication, plant maintenance — one report, one invoice, one date. From hammer mills and conveyors to boilers, compressors, pumps, tanks, gearboxes and hydraulics — we rig certified, we align laser, we pressure-test witnessed, and we train your operators in Swahili/Sheng (logged). Fixed-price in 24h after 1-day audit. Preventive from KES 85k/mo per line — spares kit + monthly MTBF/MTTR report + quarterly vibration/thermography.

Explore Mechanical Engineering →

Deliverables You Keep

  • • 12-page photo audit, EBK-stamped GA, mill certs 3.1, 6G + NDT (MPI/DPI)
  • • Laser alignment ±0.05mm + vibration baseline + thermography at 110%
  • • 87-page O&M + CMMS + spares kit (6-month) + training register
  • • 2-year workmanship warranty — realign free if drift beyond ±0.05mm

Thika Cloth Mills, Bamburi, Bidco — renewed because we make them look good in audits.

Electrical Engineering — Load-Studied, EBK-Stamped, 8-Second ATS

61% of Nairobi factories pay 20–35% in KPLC penalties they call “fixed”. It’s not fixed — it’s a tuned 150kVAR bank you don’t have. We log for 7 days, size PFC to 0.96, guarantee 0 penalty in writing — payback 4–7 months. Athi River: penalty KES 120k/mo → 0, 48Ω earth → 3.2Ω, 68°C hot spot → 41°C, OUTAGE ZERO SINCE. EBK & EPRA Class A, NCA Electrical, IEEE/BS 7671, 7-day load log, thermography, EBK single-line, cable derating per BS 7671, earthing ≤5Ω, PFC with detuned reactors, MCC/PCC, genset + AMF/ATS 8s tested with load bank (0–100% step). No energization without megger, polarity, RCD, thermography cert.

Power distribution (11kV/415V, MCC/PCC), control & automation (Siemens/Allen-Bradley PLC, SCADA, VFDs 35–50% energy saving), backup & safety (50kVA–1MVA gensets, UPS, RCD 30mA, arc flash Cat 2, LOTO). 95% first-time KEBS/NCA pass. 24/7 standby, 4h response. Audit from KES 45k; installs fixed-price after load study; genset+ATS from KES 1.2M (80kVA) with 1-year service & quarterly thermography.

Explore Electrical Engineering →

The Bill Proves It

  • • 7-day load + earth + thermography report (15 pages, graphs, hot spots)
  • • EBK stamped single-line, cable schedule, PFC calc, earthing ≤5Ω
  • • Load bank + ATS 8s failover proven under load — or we replace free
  • • Insurer premium cut 12% at Athi after EBK file — your finance team will love it

Industrial Maintenance — 250h Service, 38 Checks, 98.1% Availability

Reactive is 3–5× preventive — because downtime is KES 80k/hour, not because labor is cheap. At Kwale, 340t excavators went 91% → 98.1% with 250h in-pit service (38 checks, 1.5h avg, zero missed in 90 days) + oil analysis 42 samples/90 days (iron 87ppm caught 3 trends → no KES 4.2M final drive). MTBF 14→19 months on bearings (+36% life). Spares -22% (planned bulk vs DHL). Audit 2.3 → 0 observations. For KES 85k/mo per line (Nairobi metro) you get weekly 2h visit + 24/7 phone + quarterly vibration/thermography + spares kit in Ruiru (24h) + monthly report (MTBF/MTTR/availability + next 30-day plan) + training 2 operators + 1 artisan (Swahili tick-box, QR on machine, Fiix).

We rank A/B/C before you spend — 80% time on A (hammer mill, sifter, main conveyor). 124 PM tasks daily/weekly/250h/1000h with photo guides. Completion 38% → 94% at Thika because it was tick-box, not essay. If MTBF isn’t rising, it’s not preventive — it’s scheduled breakdown. We fix that.

Explore Industrial Maintenance →

A/B/C Ranked, CMMS-Loaded

  • • Registry + ranking (A stops line) in 1 day, no shutdown
  • • Fiix/CMMS QR + Swahili tick-box — overdue red on phone
  • • KES 8M consignment on shelf — labelled, vendor-managed
  • • Monthly one-PDF report for Monday ops review

CCTV Installation — 4K H.265, 30-Day + NAS, 0 Packet Loss

16 cams at 2.8mm = 40% blind at 3m height. 32 cams mixed 4mm/6mm = 3% blind. That’s why theft fell 90% at Nairobi Industrial Area — we mapped blind on CAD, not ladder, and covered 3 docks where 90% thefts happened: 2× PTZ 25× + 4× bullets (verify). H.265 4K 15fps 4Mbps → 43TB for 30 days 24/7 for 32 cams → 48TB NVR + 48TB NAS second copy (if NVR stolen, you still have evidence). 7-day overwrite is an apology, not evidence. PoE 1.8km with fibre + UPS 2h, 0 packet loss, 1ms, labelled both ends — not 9V at camera (12V source 180m) and black at night. Mobile iOS/Android + desktop + 2 guard huts, push on motion/line cross, access control link (badge 1234 at 02:13 + video + snapshot).

WDR 120dB, IR 30m, IP67, IK10, smart IR, thermal/ANPR optional (plate 35m day). CA type-approved, KEBS, Data Protection Act 2019 (privacy masking, signage, register). Quarterly lens/health/storage audit — because Nairobi dust is a filter. From KES 280k for 8-cam HD kit (NVR 2TB + mobile, 1-year service) to 32× 4K enterprise — storage guaranteed 30 days at 15fps H.265 or we add HDD free.

Explore CCTV Installation →

Evidence, Not Video

  • • Lens/storage/PoE calc on plan — blind 40% → 3% on paper before ladder
  • • 0 packet loss tested, privacy masks, signage, CA/Data Act file
  • • Export MP4 with hash + timestamp — DCI-ready, not “DVR overwrote”
  • • 1-year warranty + quarterly cleaning — dusty lens = blind camera

PPE Supply — KEBS D-Mark, EN-Tested, Fit-Tested 3 Sizes

A KES 1,200 helmet cracks in 6 months. A KEBS lot KES 2,800 lasts 3 years with docs. But the real failure is fit: one-size 58cm helmets on 53–63cm heads, size 42 boots on 38–48 feet — wear 30% because they hurt. At Kwale we fit-tested 3 sizes per item (45min/30 staff, palm-measured gloves 7–11), let workers choose — wear 30% → 95% in 2 weeks, even at 32°C at 2pm. Zero OSHA observations in 6 months (was 12), near-misses -60%. Every lot: KEBS D-mark + EN report (EN 397 20kV, EN 388 4X43C cut 5, EN ISO 20345 S3 SRC, EN 149 FFP2, EN 352-1 NRR 31, EN 361 harness) — batch-traced, attached to delivery note. Cheap PPE costs 2×: KES 11,100/year/worker rebuying 4× vs KES 8,200 for 12-month Dynatec kit with docs + training + 7-day swap + 10% spares on site.

Starter kit KES 9,500 (helmet + goggles + gloves + vest + boots), bulk 50+ KES 8,200 with KEBS docs + 6 toolbox talks (Swahili/Sheng) + posters + cleaning station + register 180 rows + WhatsApp 4.2h avg + visits week 1/4/12. Head/eye/face, body/hands/feet, breathing/hearing/fall — 32 products, 8 categories. 7-day swap, 3-month stitching warranty. If DOSHS queries a batch, we supply EN report in 24h.

Explore PPE Supply →

Worn, Not Issued

  • • Fit test 3 sizes on site — helmet 53/58/63, boots 38–48, palm 7–11
  • • 6 talks + posters + inspection checklist — register 180 rows, signed
  • • 7-day swap + 10% spares in Kwale/Ruiru — no “bring to Ruiru”
  • • KES 22/day vs KES 44/day imports — 2× cheaper per worn day

Project Management — MSP/Primavera, EVM at -5%, One File on Day 23

Without a baseline, “on track” is opinion — you discover -30% at month 2 when EOT is your only letter. We baseline WBS 200 tasks, critical path (35%), S-curve, risk register (10 risks), EVM SPI/CPI weekly. At -5% (SPI 0.95) week 2 we crash (add 2 fitters KES 40k) vs 14-day delay KES 1.12M (28×). In Thika we caught 3-day spares delay at 6am Tuesday and rerouted Ruiru→Thika by 10am — finished day 22 exactly, zero punch, NCA zero. Spec is not “motor 75kW” — it’s M10×40 8.8, DN100 PN16, 95mm² derated — prequal 3 vendors, expediting weekly photo + packing list, kitting per work front cage (not mixed pallets), laydown by sequence. Daily toolbox 15min, QA/QC 6G + MPI/DPI + hydro 1.5× + laser ±0.05mm + megger + thermography, punch list 47→0. O&M 87 pages + as-builts + CMMS.

One report (SPI/CPI + photos + lookahead), one invoice, one date. Turnkey concept to handover — manufacturing, energy, mining, construction, logistics. Fee 8–12% or lump sum from KES 150k, audit free, baseline in 2 days, mobilize 72h after approval. Baseline in 2 days or 50% off; SPI/CPI weekly or refund that week; punch zero or we stay at our cost.

Explore Project Planning →

One Owner, Not Five Foremen

  • • WBS 200 + critical path + S-curve + risk + EVM — see -5% early
  • • Kitting + laydown — 40% less search, artisans install not hunt
  • • Punch zero before handover — NCA 0 day 23, not day 73 chase
  • • Fee 8–12% saves 15% overrun (KES 2.7M on KES 18M) — you pay for control

The Dynatec Standard — What “Done” Means Every Time

Stocked, Not Listed — Ruiru Warehouse

SKF/FAG bearings, S3 SRC boots, 4K cams, 11kV cable, 150kVAR PFC — on shelf, not in catalogue. 24h dispatch Nairobi metro, 72h nationally. 3 mobile teams, Spur Mall HQ. When you call at 2am, we pick — not quote.

Stamped, Tested, Logged — Every Handover

EBK stamps, 6G weld + NDT, 1.5× hydro, laser ±0.05mm, vibration 0.8 mm/s, thermography at 110%, megger >100MΩ, RCD 30mA, earth ≤5Ω, 7-day load log, 87-page O&M — your file, not your word.

Trained, Logged, Supported — After We Leave

Swahili/Sheng toolbox talks, register 180 rows, QR on machines, CMMS, WhatsApp 4.2h avg, visits week 1/4/12, monthly MTBF report, quarterly thermography/lens cleaning, 24/7 standby 4h. We stay.

A turnkey industrial partner in Kenya is not a contractor — it’s an owner: one PMO for mechanical + electrical + maintenance + CCTV + PPE, with a warehouse that stocks, engineers that stamp, technicians that test, and a file that passes DOSHS/NCA/KEBS first time. That’s Dynatec — mechanical install -72% downtime, electrical penalties 0, maintenance 98.1%, CCTV theft -90%, PPE zero observations, project 22 days zero punch. Every service page carries pricing (mechanical KES 85k/mo, electrical audit KES 45k, PM KES 85k/mo, CCTV KES 280k, PPE KES 8,200/kit, PM fee 8–12%), compliance (NCA 3, EBK, EPRA, KEBS, OSHA, CA, Data Act), case studies (Thika, Athi, Kwale, Nairobi IA), comparison tables, and FAQs — all searchable via search and linked to projects, PPE catalog, industries, and contact.

Need One Partner for Six Trades?

1-day audit → 24h fixed price → 72h mobilization. Ruiru warehouse, 3 mobile teams, 47 lines at 98.2% today.