Industry Focus • Energy & Utilities
Energy & Utilities — Zero KPLC Penalties, 100% Uptime
For cement, milling, and water plants paying KES 120k+/mo in power factor penalties. We log, correct, and guarantee 0.
Top pains we solve for Energy & Utilities:
- • KPLC power factor penalties 20–35% — PF 0.78, no PFC
- • Genset not syncing — ATS fails, 8-min blackout, scrap
- • Hot panels 68°C, trips, neutral burn — no thermography
- • No earthing report — 48Ω (need ≤5Ω), audit fail

Services Tailored for Energy & Utilities
Power
11kV/415V, PFC 150kVAR 6-step, earthing 3.2Ω (was 48Ω)
Backup
200kVA Perkins + AMF/ATS 8s sync, burn-in log
Maintenance
quarterly thermography + load balance
Safety
arc 8cal, LOTO, RCD 30mA
Featured Case Study for Energy & Utilities

Power System Installation
Delivered backup generator systems, distribution networks and commissioning support.
Read case study →PPE Bundle for Energy & Utilities
Pre-kitted for energy & utilities — KEBS certs, training, 7-day swap. From KES 8,200/kit (50+).
Build Energy & Utilities BundleFAQ
Energy & Utilities — FAQ
Can you remove KPLC penalties?
▼
Yes — 7-day log, PFC sizing, install, re-measure. Guarantee: penalties 0 in 30 days or we re-size free. Most save 20–35%.
Do you do earth testing?
▼
3-point fall-of-potential, 3.2Ω cert. If >5Ω, we add rods + bentonite and re-test.