+254 143 293 534

Industry Focus • Manufacturing

Manufacturing — Zero-Downtime Production Lines

For flour, cement, and packaging plants where 1 hour downtime = KES 500k. We keep your OEE 98%+ with PM done in Swahili.

Top pains we solve for Manufacturing:

  • Line downtime 8–15% — 22-day backlog, missed supermarket OTIF
  • Motor energy waste 15–30% on old drives, PFC penalties
  • Spare parts stockouts — 3-week DHL, no warranty
  • KEBS/NCA audit findings on rigging, alignment, docs
Manufacturing

Services Tailored for Manufacturing

Mechanical

conveyors, pumps, piping — laser ±0.05mm

Electrical

MCC, VFDs, PFC — 32% saving shown in 7-day log

Maintenance

vibration + thermography + oil — 30% fewer stops

PPE

cut-5 gloves, S3 boots, helmets — fit-tested, 3 sizes

OSHA 2007KEBS KS 2942NCA Category 3EBK-licensed

Featured Case Study for Manufacturing

Manufacturing Plant Upgrade

Manufacturing Plant Upgrade

Installed new machinery, optimized production systems and improved operational efficiency.

Read case study →

PPE Bundle for Manufacturing

Pre-kitted for manufacturing — KEBS certs, training, 7-day swap. From KES 8,200/kit (50+).

Build Manufacturing Bundle

FAQ

Manufacturing — FAQ

What maintenance interval for manufacturing lines?

Critical lines every 250h, auxiliary every 500h — with vibration and oil analysis. We set intervals after audit and load study. Thika: 14% → 3% downtime in 4 weeks.

Can you work without stopping production?

Yes — phased shutdowns and night shifts. Most clients keep at least one line running. We plan with your production manager and hand over with spares kit + O&M.

Need Manufacturing Experts?

Get Fixed-Price Quote in 24h