Engineering Projects That Deliver Real Industrial Impact — Measured Before/After

Every card below is a field record, not marketing: challenge → scope → measured result → handover file. 6 flagship cases with 2-year warranty, EBK-stamped docs, and spares kit.

Thika -72% downtimeAthi penalties 0 • 32% savingKwale 0 obs (12→0)Mining 98.1% • 340tNairobi theft -90%
NCA 3 • EBK/KETRB • KEBS • OSHA 2007 • Insured • 47 lines today at 98.2% uptime
Manufacturing Plant Upgrade-72% downtimeMechanical4 weeks • Mar 2024

Manufacturing Plant Upgrade

Installed new machinery, optimized production systems and improved operational efficiency. 14% downtime → 3% in 4 weeks, +18% throughput.

14% → 3% • +18% throughput

📍 Thika Cloth Mills, Thika • NCA • EBK • KEBS NDT

Read case study → challenge • scope • result • handover
Power System InstallationPenalties 0Electrical10 days • May 2024

Power System Installation

200kVA genset + ATS + PFC + earthing. Zero outage since install, KPLC penalties 0, 32% energy saving.

KES 120k/mo → 0 • 32% saving

📍 Twiga Cement, Athi River • EBK • EPRA • IEEE 446

Read case study → challenge • scope • result • handover
Safety & PPE Rollout0 observationsSafety & PPE6 months • Jul 2024

Safety & PPE Rollout

Kitted 180 staff, trained, fit-tested. Zero OSHA observations in 6 months, near-misses -60%.

12 → 0 obs • -60% near-misses

📍 Kwale Mining Site • OSHA • KEBS D-mark

Read case study → challenge • scope • result • handover
Industrial Maintenance (Mining)98.1% availabilityMaintenanceOngoing 250h • Feb 2024

Industrial Maintenance (Mining)

Heavy machinery servicing, 98.1% availability on 340t excavators.

MTBF 140→310h • MTTR 8.2→3.1h

📍 Kwale, Kenya • OSHA • MSD • KEBS

Read case study → challenge • scope • result • handover
CCTV Surveillance Project-90% theftCCTV60 days • Jun 2024

CCTV Surveillance Project

32 HD cameras + NVR + access control. Theft -90% in 60 days.

32× 4K + NVR 30d + mobile

📍 Nairobi Industrial Area • CA • KEBS • Data Act

Read case study → challenge • scope • result • handover
Electrical Infrastructure0 reworkElectrical3 weeks • Jan 2024

Electrical Infrastructure

Commercial facility: wiring, lighting, distribution, safety systems.

KEBS pass first time

📍 Ruiru, Kenya • EBK • NCA • OSHA

Read case study → challenge • scope • result • handover

6 flagship cases • Full delivery framework: Day 1 audit → Day 2 proposal → install → test & commission → O&M + 2-yr warranty. 200+ installs total.

How We Keep Projects On Time, On Budget, Audit-Ready

Day 1→2

Audit → Fixed Price

Walk line, photo report, 1-day audit (free Nairobi metro >3 mo) → 24h proposal with spares, timeline, warranty.

-72% • 0 • 98.1%

Metrics, Not Marketing

Thika -72% in 4 wks, Athi penalties 0, Kwale 0 obs, mining 98.1%. Measured before/after, not claimed.

95%

Docs That Pass First Time

EBK-stamped, NDT, thermography 68°C→xx, earthing 3.2Ω, O&M + spares list + training log.

Dynatec has delivered 200+ engineering projects in Kenya — from mechanical installations in Thika to power systems in Athi River and PPE rollouts in Kwale. As an NCA Category 3 licensed contractor, we handle manufacturing, construction, mining, and energy with 24–72h mobilization and 2-year warranty. Explore each case study for challenge, scope, and measured result — or request a site audit and get a fixed-price proposal in 24h.